Yeongjong-Cheongna Connecting Road (3rd Incheon Bridge) Construction (LOT 1) Technical Proposal Bid for Detailed Design

Location: Jungsan-dong, Jung-gu, Incheon ~ Cheongna-dong, Seo-gu, Korea
Project Outline:
Total Length – 2.652km, 6 Lanes Motorway
  (Road: 582m, Offshore Bridge: 2,020m, Jungsan Bridge: 50m)
Offshore Main Bridge – 2 Pylon Curved Cable Stayed bridge
  (Bridge Length: 750m, Main Span: 280m)
Approach Bridge – PSC Beam Girder (1,270m)
Period: February 2021 – September 2021
Employer: Incheon Free Economic Zone Authority
Client: Hanwha E&C
Design Consortium: BANDI Consultant, Kyungdong Engineering, Dasan E&G


Categories: BANDI News