Chacao Bridge Project, Chile – Construction Engineering of Steel Deck

Bridge Type: Multi-span Suspension Bridge

Main Span: 1,155m / 1,055m

Total Length: 2,754m

Project Period: 2019 ~

Client: MOP of Chile, Hyundai E&C, Envico

Work Scope:

  • Erection planning – Structural analysis, camber control, erection plan
  • Temporary structure – Lifting lug, erection hinge, set-back/set-forward device, closing device, movable scaffolding, welding procedure
  • Equipment design – lifting device, lifting winch, etc.