Hwatae-Baekya Road Construction of National Route 77 (Lot 1) – Tender and Detailed Design

Location: Yeosu-si, Jeonlanam-do, Korea

Bridge Type: Bridge 1 – Double-tied arch bridge (95 + 220 + 95 = 410m) + composite tub girder bridge (3@67 = 201m)

Bridge 2 – 3 dimensional suspension bridge (L = 910m)

Total Length: 6.05km (Bridge 1 – 0.611km, Bridge 2 – 0.910km, Road – 4.528km)

Project Period: Tender Design – Jun. 2020 ~ Nov. 2020

Detailed Design – Nov. 2020 ~ Sep. 2021

Employer: Iksan Regional Construction & Management Office

Client: POSCO E&C

Design Consortium: BANDI Consultant, Yooshin, Soosung, Dongbu